There has been the inevitable delay on the windows and the doors which might be a big problem or not. In the meantime
work on the inside of the barn roof moves on so the scaffolding can come down so work can commence on the floors.

|
| Plasterboarding between the beams |

|
| Then plastering... |

|
| Apply white undercoat... |

|
| And finally an Ivory top coat so the scaffold can come down. |

|
| Elsewhere new oak studs are being constructed in the hallway. |

|
| Entrance from the hallway to the open plan lounge and kitchen area. |

|
| Not the most exciting picture on the site but part of the stairway in the extension is installed! |