Still no windows so the outside cannot be finished. The scaffolding in the main barn is down, which really shows off
the old timber frame. Other parts of the build feel like the end is in sight.

|
| With the scaffolding down and the internal oak studwork in progress the lounge takes shape. |

|
| This will be the kitchen - which is full of bits for the underfloor heating |

|
| Waterpipes running the length of the building which will be buried in the floor. |

|
| Original studwork in bedroom 2 and door to ensuite shower room |

|
| The lounge in the extension plastered out with just the floor and windows to do |

|
| The main hallway with the new oak studwork wall with doorways through to bedroom 3 and the main barn |

|
| Still waiting for the windows before the weatherboarding can be fixed to the outside |
June 09 pics
Home
|