Paynes Farm Barn Conversion

May 09 pics
Home | July 08 pics | August 08 pics | September 08 pics | October 08 pics | November 08 pics | December 08 pics | January 09 pics | February 09 pics | March 09 pics | April 09 pics | May 09 pics | June 09 pics | July 09 pics | Job Done and The Team | Artist's Impression

Still no windows so the outside cannot be finished. The scaffolding in the main barn is down, which really shows off the old timber frame. Other parts of the build feel like the end is in sight.

fireplace.jpg
With the scaffolding down and the internal oak studwork in progress the lounge takes shape.

kitchen.jpg
This will be the kitchen - which is full of bits for the underfloor heating

waterpipes.jpg
Waterpipes running the length of the building which will be buried in the floor.

bedroom2.jpg
Original studwork in bedroom 2 and door to ensuite shower room

snug2.jpg
The lounge in the extension plastered out with just the floor and windows to do

hallway.jpg
The main hallway with the new oak studwork wall with doorways through to bedroom 3 and the main barn

mayfinal.jpg
Still waiting for the windows before the weatherboarding can be fixed to the outside