The windows arrive and so progress can be made on installation and then fixing the weatherboard. Inside the barn the underfloor heating and screed gets laid in preparation for final finish. The septic tank is installed in the rear garden.

jun1.jpg
Groundworks to the rear of the building

jun2.jpg
Windows and door frames then weatherboarding

jun3.jpg
Deep hole for the septic tank

jun4.jpg
The septic tank - just hope the pumping mechanism works

jun5.jpg
Lounge and dining area from the kitchen

jun6.jpg
Kitchen area from lounge ready for floor tiles

junfinal.jpg
Hopefully less than two months to go.