The windows arrive and so progress can be made on installation and then fixing the weatherboard. Inside the barn the
underfloor heating and screed gets laid in preparation for final finish. The septic tank is installed in the rear garden.

|
| Groundworks to the rear of the building |

|
| Windows and door frames then weatherboarding |

|
| Deep hole for the septic tank |

|
| The septic tank - just hope the pumping mechanism works |

|
| Lounge and dining area from the kitchen |

|
| Kitchen area from lounge ready for floor tiles |

|
| Hopefully less than two months to go. |